Incident Metrics: Assignment Group Duration Continues Until Closed and Create-to-Resolve Duration Calculates Only on First ResolutionIssue You may observe the following behaviors with Incident duration metrics: Assignment Group Duration continues to accumulate time after an Incident moves to the Resolved state and only finalizes when the Incident is Closed.Create to Resolve Duration does not include additional time spent after an Incident is reopened and resolved again. Release All supported releases. The behavior has been confirmed as platform design and is not release-specific. Cause Assignment Group Duration Assignment Group Duration is a Field Value Duration metric.The metric remains active until the tracked field changes or the Incident's Active flag becomes false.For standard Incident records, the Active flag becomes false when the Incident is moved to Closed, rather than Resolved.Therefore, the metric continues accumulating time between the Resolved and Closed states. Create to Resolve Duration Create to Resolve Duration is a Script Calculation metric.The duration is calculated when the Incident first reaches the Resolved state.If the Incident is subsequently reopened and resolved again, the metric is not recalculated.As a result, the additional elapsed time after reopening is not added to the original metric value. Resolution The Dev team has confirmed that both behaviors are working as designed and are not considered product defects. There is currently no out-of-the-box configuration available to modify these metric calculation behaviors. If a customer requires different calculation logic, such as including the time spent after an Incident is reopened in the resolution duration, they would need to implement a custom metric definition based on their reporting requirements. If the customer would like the standard behavior to be reconsidered in a future release, they can submit an enhancement request through the Idea Portal. Product teams review submitted ideas based on feasibility, customer demand, and product priorities. For more information, refer to Idea Portal Information – KB0755878.