Pre-import or post-import script on a Scheduled Data Import is not executedIssue The Pre script or Post script configured on a Scheduled Data Import does not execute, even though the corresponding option is enabled: Execute pre-import scriptExecute post-import script The import set and associated transform maps may complete successfully, but the configured script is not executed. This behaviour may also be observed when Concurrent import is enabled Release Zurich Cause The dictionary definitions for one or both of the following fields are incorrectly configured with the field type String: pre_scriptpost_script These fields must be configured with the field type Script so that their contents can be evaluated as server-side scripts. Resolution Test the following steps in a non-production instance first: 1] Navigate to System Definition > Dictionary. 2] Locate the dictionary entries for: • Table: scheduled_data_import• Column: pre_script• Column: post_script 3] Review the Type value for each field. 4] If the field type is set to String, change it to Script. 5] Save the changes.