Tenable integration is failing with 'Import job was cancelled, reached maximum number of retries' errorIssue Tenable integration is failing with 'Import job was cancelled, reached maximum number of retries' error Symptoms The below errors are observed on the logs: sn_vul (VulnerabilityDSAttachmentManager): Import job was cancelled, reached maximum number of retries, forcing error sn_vul (VulnerabilityIntegrationUtils): Retrying errored integration process VINTPRCxxxx, current state is pendingretry, errored entries are 0, next retry is due on , triggered by and integration run is VINTRUNxxxx. No errors are observed on HTTP calls, which are consistently returning a 200 successful response code, indicating that the requests are being processed correctly and the server is responding as expected without any issues or failures during these interactions. Release Yokohoma, Zurich Cause The reason the tenable.sc integrations are failing because the Vulnerability Import Templates, which are essential for the proper functioning of these integrations, are missing from the scheduled_import_set table within the instance. This absence prevents the system from correctly processing and importing vulnerability data, leading to the failure of the integrations.There should be 10 templates OOB, check the deleted audit records as the templates might be deleted due to unsuccessful repair or failed plugin upgrade. Resolution Export the out-of-the-box (OOB) templates as XML files from an instance that is not experiencing this issue. Then, import these XML files into the affected instance. After that, re-run the integration to apply the changes. Following these steps carefully will resolve the issue effectively.