In Enterprise Architecture Workspace side panel, 'Life Cycle Stage Status' options are not changing based on the inputs from 'Life Cycle Stage'.DescriptionIn Enterprise Architecture Workspace side panel, 'Life Cycle Stage Status' options are not changing based on the inputs from 'Life Cycle Stage'.Steps to Reproduce 0. Go to EA Workspace > Application Rationalizationhttps://<instance>.service-now.com/now/apm/application-rationalization1. Click on any Business application2. Observe side panel will preview the record (i.e. 'Life Cycle Stage' = Operational, 'Life Cycle Stage Status' = In Use)3. Erase the current value of 'Life Cycle Stage Status' field4. Observe the options available (i.e. End of Support, In Use, Pending Retirement)5. Erase the current value of 'Life Cycle Stage'6. Choose other option (i.e. End of Life)7. Click on 'Life Cycle Stage Status' and observe the options are still the sameExpected in this scenario: Options of 'Life Cycle Stage Status' should change to (Obsolete, Retired)based on the mappings from the [life_cycle_control] table.WorkaroundOption 1: In Enterprise Architecture Workspace > Application Rationalization side panel, click on the 'Full details' link at the bottom to load the form in full view. Option 2: Update the business application record in platform. This issue is happening in workspace only.Related Problem: PRB1850961