For several countries, scheduled report time changed/delayed after daylight saving time changeIssue Scheduled reports that are set to run "periodically" are running late/ahead-of-time by 1 hour after daylight saving time changeCauseFor scheduled reports, if Run field is set to 'Periodically', the duration is between each scheduled report run. The duration can be days, hours, or minutes. Regardless the time zone, daylight saving time change - it, apparently, calculates the next run time based on the last/previous run.ResolutionTo run the reports it was before - For the existing scheduled report, update the field "Starting" to any near future timeframe and time as per requirement (OR) Re-create the scheduled report as per your requirements For example: Let us consider a scheduled report in Israel time zone running periodically every 8 hours starting at 12AM.In case of Israel, the daylight saving time shifts 1 hour ahead at 2 AM resulting the time change to 3 AM.Hence, the report triggers at 9 AM, 5 PM, 1 AM instead of 8 AM, 4 PM, 12 AM respectively.Here, the scheduled reports trigger an hour late than expected. Update the Starting field to any near future date and set the time to 12 AM/8 AM/4 PM.